I guess we'll see you boys in the morning. Here is the closure report...
http://www.oregon.gov/ODF/TSF/road_and_trail_rpt.shtml
#7
Clyde's Trail is temporarily closed for repair and upgrade work. The work is being contracted out. The Contractor will begin work in late fall 2006. The trail will re-open in summer 2007, once all repair and upgrade work is complete.
#8 Julie's Trail is temporarily closed to prevent further damage to the trail and to minimize erosion and impacts to water quality and to repair significantly damaged sections of the trail. Repairs are currently scheduled to take place during the spring and summer. The trail will re-open when the repair work is complete. Respecting this trail closure will allow us to more quickly repair the damage and open the trail.
#9 Sidewinder Trail is temporarily closed for repair and upgrade work. The work is being contracted out. The Contractor will begin work in spring 2007. The trail will re-open in summer 2007 once all repair and upgrade work is complete.
#10 University Fire Power Trail temporarily closed for the winter season to protect the trail resource, prevent further trail damage and to minimize erosion and impacts to water quality. The trail will re-open in late spring 2007.
#12 Gummy Worm Trail is temporarily closed due to logging operations that are part of the in the Bill's Beaver Trap Timber Sale. Logging operations will continue through 2006. Once the timber sale is complete the trail will be cleared and maintenance work will take place. The trail will re-open in spring 2007.
#14 Firebreak Five Trail. The top (south segment) of Firebreak Five is temporarily closed due to logging operations that are part of the Bill's Beaver Trap Timber Sale. The segment of trail that is closed is not sustainable and is being rerouted. A portion of the new reroute will be constructed by the timber sale contractor. The remainder of the reroute will be constructed by Oregon Department of Forestry after the timber harvest activity is complete. This segment of trail is not expected to re-open until spring or summer 2007. The
Crushers Loops remain open and can be accessed from the top of the trail by continuing up Saddle Mountain Road and staying left until you reach the top of Firebreak Five.
#15 Island Trail is temporarily closed for repair and upgrade work. Repair work is scheduled for late fall 2006. The trail will re-open in late spring 2007 once repair and upgrade work is complete.
#16a Saddle Up Trail is temporarily closed for the winter season to protect the trail resource, prevent further trail damage and to minimize erosion and impacts to water quality. The trail will re-open in late spring 2007.
#16d Airplane Hill Trail. A segment of the
Airplane Hill Trail has been significantly damaged and is no longer sustainable. The damaged segment will need to be permanently closed and a new segment will need to be located and developed. Relocation work will take place in 2006. The Oregon Department of Forestry will be working with local trail use clubs to locate and design the new segment. The trail will remain closed until the new segment has been constructed.
#23 Marianna Trench Trail. A segment of this trail has been significantly damaged and is no longer sustainable as a trail. The trail will be evaluated this winter to determine if it can be repaired or if a new segment will need to be built.
#24 Bates Road Trail is temporarily closed due to a logging operation that is part of the Helibates Timber Sale. The trail will be temporarily gated at the junction of Highway 6 until the operation is complete. The trail will remain closed until the timber sale harvest activity is complete.
#25 Elliott Creek Trail is temporarily closed for repair and upgrade work. The work is being contracted out. The Contractor will begin work in late spring 2007. The trail will re-open in summer 2007 once all repair and upgrade work is complete.
#55 Blackwater 50 is temporarily closed due to logging operations that are part of the Bill's Beaver Trap Timber Sale. Logging operations will continue through 2006. Once the timber sale is complete the trail will be cleared and maintenance work will take place. The trail will re-open in spring 2007.