OutkastBoss
NAXJA Forum User
- Location
- Saint louis
Yea we did 1" flat bar there on that part and 2" angle to the "frame" and the 2x6 slides in place and gets welded in .. (ala jeep kings walkthrough)
i thought it was going well we have the rockers cut out and all the peices cut and fit (besides the frame tie ins and the outer rail that i ordered)
And he welded in all of one side (besides tie ins and outer rail)
but apparently the overhead seam that needs welded ended up with a few gaps (holes?) He then got frustrated and quit while trying to fill those holes.
So now im looking at a local cage builder or a C.L. guy that advertises fab. cages etc. to get this finished before i start rusting
i thought it was going well we have the rockers cut out and all the peices cut and fit (besides the frame tie ins and the outer rail that i ordered)
And he welded in all of one side (besides tie ins and outer rail)
but apparently the overhead seam that needs welded ended up with a few gaps (holes?) He then got frustrated and quit while trying to fill those holes.
So now im looking at a local cage builder or a C.L. guy that advertises fab. cages etc. to get this finished before i start rusting