Today went well.
Plopped the 30 on Ryan's rack to get it started.
Drove in the pinion bearing races and put the starting shims in with the carrier and check it out.
First pattern check.
Final check (third one).
Set the pinion preload and started buttoning her up.
Had a minor setback when the ARB tube broke - will get another and finish it up at home.
Moved on to the 44.
Nailed the pattern on the first try.
Set the pinion up, drilled and tapped for the ARB, then made my oil drainage notches to keep the ARB from becoming an oil pump.
Spreaded the case to add ten thousandths to each side.
Routed the ARB line and buttoned it up, done!
Loaded up the Chief to take 'em home.
http://events.sequoia4x4.com/d/15186-2/IMG_0089.jpg[img]
Now I just gotta install them (and the Y-Link kit), do the partial transfer case rebuild (with SYE), plumb the power steering and transmission coolers, and do some little stuff like ARB plumbing/wiring and winch solenoid pack mounting.
Good stuff!