Kyle Horvath
NAXJA Forum User
- Location
- Modesto/Arcata, Ca
sounds like you found a job.
Start selling 'em!
Start selling 'em!
The speed holes are WAY more important than actually holding dirt.
Honestly, at 14 inches wide, 12 inches deep. The 1/2" sides before the cut-outs will probably be ok. I may have to get the pile in two trips, but I usually have to do it several times anyway. Besides, I have to leave room for improvement since I have nothing to do tomorrow....
Thanks for the compliments guys.
~ James
Excellent job! :thumbup::thumbup:
If you are really bored, I'll bring my rig down and you can rebuild the floors extra fancy for me.
That is kewl....I'm still amazed you haven't found work yet. You've got skills. I think you just haven't talk to the right person yet. And...if you're that bored....I've got a project or two we could discuss....:eyes::cheers:
Excellent job! :thumbup::thumbup:
If you are really bored, I'll bring my rig down and you can rebuild the floors extra fancy for me.
With speed holes?
LOL....
Andy, I need to make a 'project' of coming to your place to get rid of that hunk of steel you having laying around.
Thanks guys!
You're the second person to suggest that... I dont have anything lined up for tomorrow yet...