Got one of two A pillar dash brackets made. Solid as can. I’m happy with the result. Gotta do it again and start connecting the sliders through the floor to the bracket. Then finish the rest of the way to B pillar. Then comes more “subchassis” work for the seats and things.
I have 28 days until race day at the Busted Knuckle Offroad park and I have to:
Finish cage work
Install fuel cell
Wire fuel pumps
Mount new extinguishers and radio
Install rear amber and blue light
Get some sort of Hi Lo siren installed
Get new driveshafts installed
Get Hans neck braces here
Probably remove Windshield
Adjust rear air bumps
Fix power steering leak
Reinstall seats with new harnesses
Abbreviated list from the top of my head. I’m sure there’s more small things. Manageable but still a process nonetheless.
Sent from my iPhone using Tapatalk