NCCherokee
NAXJA Forum User
- Location
- Anderson, SC
to start, I read a lot more than I post, and generally research stuff for months before i committ to something. That said, I have a set of TNT's frame stiffeners sitting in my shed. They are all set with rosettes and they will be stitched. The jeep is prepped. those aren't my issues. My problem is that I don't know how to weld, and don't have any friends locally who can do it.
before I source the job out, I would like to know how long welding up both sides takes total. I'd say there are about 20 1/2" rosettes per side, and whatever stitching is required. For people who have installed these, what is the timeframe for getting these all welded up in one sitting? If its too long, I'll probably end up driving an hour to have a fellow er burn them in for me.
kenny
before I source the job out, I would like to know how long welding up both sides takes total. I'd say there are about 20 1/2" rosettes per side, and whatever stitching is required. For people who have installed these, what is the timeframe for getting these all welded up in one sitting? If its too long, I'll probably end up driving an hour to have a fellow er burn them in for me.
kenny