As I am sitting here waiting for the heater in the shop to do it's job, I was making up my final "to do" list for Winterfest. It is as follows:
-Finish up rear disc brake conversion (should be done today)
-install rear shocks (should be done today as well)
-change fuilds in all cavities (hope to get to today)
-install my new TNT y-link kit (work on over the next week or two)
-run new ground cable (might try to get one off 5-90)
-knock off the surface rust and repaint rockers, bumpers, sliders.. basically everything that will cover w/ black spray paint
-build a multi place spare tire carrier for the trailer since I am bringing an azz pot full of spares for people.
-service tow rig and trailer
-stop at liquor store to pick up some cases of Fat Tire :cheers:
Whats everyone else have left to do??
-Finish up rear disc brake conversion (should be done today)
-install rear shocks (should be done today as well)
-change fuilds in all cavities (hope to get to today)
-install my new TNT y-link kit (work on over the next week or two)
-run new ground cable (might try to get one off 5-90)
-knock off the surface rust and repaint rockers, bumpers, sliders.. basically everything that will cover w/ black spray paint
-build a multi place spare tire carrier for the trailer since I am bringing an azz pot full of spares for people.
-service tow rig and trailer
-stop at liquor store to pick up some cases of Fat Tire :cheers:
Whats everyone else have left to do??