I have read pretty much all the SYE threads and am Confused.
I have an NP242 and will be using 3103-27CV Yoke
My question:
What is the proper lenght to cut the tail shaft ?
I have read and come up with 3 different answers.
This thread says 1.65" of spline
http://www.naxja.org/forum/showthread.php?t=1015603&highlight=slip
This one says 1.25" of spline
http://go.jeep-xj.info/HowtoSYEconversion.htm
And I think it is IRO says 1" of spline
Using the 3103 Yoke, cutting the splines anything less than 1.65" is going to be less than 1" of spline engagment
Which is correct ?
Also what is the proper size to D&T the Shaft ?
One says 3/8" Tap using 21/64 drill
Another says 3/8" Tap using 5/16 drill
Again which is correct ?
I have an NP242 and will be using 3103-27CV Yoke
My question:
What is the proper lenght to cut the tail shaft ?
I have read and come up with 3 different answers.
This thread says 1.65" of spline
http://www.naxja.org/forum/showthread.php?t=1015603&highlight=slip
This one says 1.25" of spline
http://go.jeep-xj.info/HowtoSYEconversion.htm
And I think it is IRO says 1" of spline
Using the 3103 Yoke, cutting the splines anything less than 1.65" is going to be less than 1" of spline engagment
Which is correct ?
Also what is the proper size to D&T the Shaft ?
One says 3/8" Tap using 21/64 drill
Another says 3/8" Tap using 5/16 drill
Again which is correct ?