• Welcome to the new NAXJA Forum! If your password does not work, please use "Forgot your password?" link on the log-in page. Please feel free to reach out to [email protected] if we can provide any assistance.

To-do List

Might as well keep the tradition going of myself starting this thread :laugh:

- Swap out oil pan dipstick for locking one
- Spend some time tuning the motor (ideally I'd love to get on the dyno)
- Swap out iron heads for aluminum heads (pending my uncles time)
- Brace air bumps back to frame
- Fix leaky tires
- Get spare leaf springs
- Fix rear diff breather

Well...

I dropped the pan and welded in the bung for the new dipstick the other day.

Probably not going to get to finish any of this until after the wedding.

I have a few days off after we get back from our honeymoon so I'll probably try to tackle most of it at that point.
 
Rebuild Durango Steering Box
Install UCAs and Front Stretch
Remove 1" of lift out of the front
Install 5150s up front DONE
Brown Dog Mounts DONE
Rebuild and Install Front DS DONE
Rear Brakes + Ebrake fix? Probably not...
Replace crispy PS front ujoint
Install Steering Box Brace

Shit my list more complete but also got longer :helpme:
 
ill keep it going....
its like the flinstones in here....say hi to the muffler...

It's not a party until the entire exhaust is exposed

20131002_184454.jpg
 
stick a big dumb transfer case in there- like 10 minutes
build a couple driveshafts - like 2-3 hours
get the ecu tuned - give it to some dude on a rainy day to tune
slap all my wiring in there - couple hours
finish the fuel return line. - 20 minutes
make a crossover bar for the coilover towers- make ross do it
route my shifter cables- hour maybe?
mount the last two 40's on wheels. - 45 mins
route the front brake lines and bleed - hour
make a clutch line and bleed - hour
fill everything with fluid. - hour
Swap out coilover springs for something lower.- half hour
Charge Coilovers with nitrogen - half hour drive

hope everything works

maybe front air bumps?

EDIT: put times on everything to make myself feel better.
 
Last edited:
stick a big dumb transfer case in there- like 10 minutes
build a couple driveshafts - like 2-3 hours
get the ecu tuned - give it to some dude on a rainy day to tune
slap all my wiring in there - couple hours
finish the fuel return line. - 20 minutes
make a crossover bar for the coilover towers- make ross do it
route my shifter cables- hour maybe?
mount the last two 40's on wheels. - 45 mins
route the front brake lines and bleed - hour
make a clutch line and bleed - hour
fill everything with fluid. - hour
Swap out coilover springs for something lower.- half hour
Charge Coilovers with nitrogen - half hour drive

hope everything works

maybe front air bumps?

EDIT: put times on everything to make myself feel better.

hah most of your times is how long it takes me to thing about & set up each task.....
 
build a couple driveshafts - like 2-3 hours
get the ecu tuned - give it to some dude on a rainy day to tune
slap all my wiring in there - couple hours
finish the fuel return line. - 20 minutes
make a crossover bar for the coilover towers- make ross do it
route the front brake lines and bleed - hour
make a clutch line and bleed - hour
fill everything with fluid. - hour
Swap out coilover springs for something lower.- half hour
Charge Coilovers with nitrogen - half hour drive
build an exhaust- many many hours
radiator stuff - hour and a half

hope everything works

maybe front air bumps?

EDIT: put times on everything to make myself feel better.

the list got slightly smaller, then I remembered some more things I need to do.
 
scratch all that stuff, not going air shocks and not wheeling this weekend. whats left.
tighten up rear 4 link bolts DONE
install belly pan DONE
install shocks 25% DONE
install seats 50% DONE
bleed brakes DONE
paint and seal up rear body
hoping to wheel it once before then NEXT SUNDAY
 
boogered the floor back in place

JEEP067_zps1977ab4b.jpg
 
Last edited:
stick a big dumb transfer case in there- DONE
build a couple driveshafts - like 2-3 hours
get the ecu tuned - give it to some dude on a rainy day to tune
slap all my wiring in there - couple hours
finish the fuel return line. - DONE
make a crossover bar for the coilover towers- make ross do it
route my shifter cables- DONE
mount the last two 40's on wheels. - DONE
route the front brake lines and bleed - DONE
make a clutch line and bleed - hour
fill everything with fluid. - hour
Swap out coilover springs for something lower.- half hour
Charge Coilovers with nitrogen - half hour drive
build an exhaust- many many hours
radiator stuff - hour and a half

hope everything works

maybe front air bumps?

EDIT: put times on everything to make myself feel better.

Stupid thunderstorm. Got some stuff done anyway. Hope it passes quick so I can keep working.
 
stick a big dumb transfer case in there- DONE
build a couple driveshafts - like 2-3 hours
get the ecu tuned - give it to some dude on a rainy day to tune
slap all my wiring in there - couple hours
finish the fuel return line. - DONE
make a crossover bar for the coilover towers- make ross do it
route my shifter cables- DONE
mount the last two 40's on wheels. - DONE
route the front brake lines and bleed - DONE
make a clutch line and bleed - hour DONE
fill everything with fluid. - DONE
Swap out coilover springs for something lower.- half hour
Charge Coilovers with nitrogen - half hour drive
build an exhaust- many many hours
radiator stuff - DONE
breather hose stuff
gas pedal stuff

hope everything works

maybe front air bumps?

EDIT: put times on everything to make myself feel better.

me adding "DONE" to stuff as I finish them makes me feel like I'm actually accomplishing something.
 
stick a big dumb transfer case in there- DONE
build a couple driveshafts - like 2-3 hours NEED TO ORDER PARTS
get the ecu tuned - MAKE APPOINTMENT
slap all my wiring in there - DONE
finish the fuel return line. - DONE
make a crossover bar for the coilover towers- make ross do it
route my shifter cables- DONE
mount the last two 40's on wheels. - DONE
route the front brake lines and bleed - DONE
make a clutch line and bleed - DONE
fill everything with fluid. - DONE
Swap out coilover springs for something lower.- WAITING ON PARTS
Charge Coilovers with nitrogen - half hour drive
build an exhaust- many many hours WAITING ON PARTS
radiator stuff - DONE
breather hose stuff WAITING ON PARTS
gas pedal stuff NEED TO ACQUIRE
Build my traction bar crossmember- couple hours

hope everything works

maybe front air bumps?WAITING ON PARTS

EDIT: put times on everything to make myself feel better.

me again flooding this thread with my bullcrap!
 
To do:
-Pick up an install a hitch
-Install tank skid
-Order a DS for the rear
-Install SYE'd 231 and new DS
-Install HD crossmember and skid plate
-Breather line for the front axle
-Maybe motor/tranny mounts, which means installing the new header too. Maybe.
 
Back
Top