- Location
- Southern Maryland
I'm about to start the serious work on my 91 beater and have decided that I'm going to do the SYE install first. This isn't needed right away but it will be needed within a few months (initial lift will be 3" but I will add another 2-3" in the summer), so I might as well do it now.
I have an NP231 transfer case, a C8.25 in the rear and a D30 up front. I want to replace the front drive shaft at the same time as the rear stuff so that it is not a weak point, and besides I think it is worn out anyway.
Any recommendations on what to get or where to go?
Thanks!
I have an NP231 transfer case, a C8.25 in the rear and a D30 up front. I want to replace the front drive shaft at the same time as the rear stuff so that it is not a weak point, and besides I think it is worn out anyway.
Any recommendations on what to get or where to go?
Thanks!