So far install has gone pretty smooth (although it has taken longer than I had expected, approx 12 hours for rear and hack and tap SYE). I have the rear totally completed (looks ridiculous right now) But I have some slight driveshaft vibration I think. I installed the RE hack and tap and a high angle driveshaft with 4 degree shims with full RE leaf packs. Is this vibration due to not having any weight in the back? Even with the 4 degree shim the pinion doesnt quite point in line with the driveshaft. The only problem I had with the rear is when I took the U joints off one side and loosened them on the other. The axle spun and it snapped the new longer RE brake line. I had to drive 90 miles roundtrip just to find someone who had an YJ rear brake hose in stock. I felt pretty dumb after this.
Does anyone have any suggestions for doing the front? I have bought a JKS tracbar and have fixed LCAs, adjustable UCAs, 3/4" spacers and JKS disconnects. Can I do one control arm at a time? I already have installed my longer brake hoses. I'm just worried about getting the control arms to line up so I can bolt them in.
Does anyone have any suggestions for doing the front? I have bought a JKS tracbar and have fixed LCAs, adjustable UCAs, 3/4" spacers and JKS disconnects. Can I do one control arm at a time? I already have installed my longer brake hoses. I'm just worried about getting the control arms to line up so I can bolt them in.