Alopanec
NAXJA Forum User
- Location
- California
Im planing on going to 456 gears with spartan locker in my 98 xj its got a d30 hp up front and 8.25 in the rear with the np231 tcase and ax15 tranny my question is that im short on time and would like to split the install for each axle between two weekends because its my daily and i have to get to work monday-friday so i was wondering if i could do the rear one weekend and then remove front drive line to still be able to drive to work and finish the front install the next weekend its maybe a 6mile round trip drive with no plans on going on the freeway or anything would this be something i could do safely