country2
NAXJA Forum User
- Location
- Homer Georgia
Hi, I have a 2000 Jeep Cherokee about 135k miles and I know for sure the drivers side floor is rusted out pretty bad have not removed carpet yet to see if any other places are bad but looking underneath and poking with a screw driver its just drivers side.
Now I have done lots of reading and still wondering on installing the panel if I want to/need to weld (don't have a welder but guess I can buy one and yes I can weld but has been a while) or just do the 3m panel adhesive and rivets. I read that using steel rivets about 1" apart is just as strong as welding and so is the 3m panel adhesive. What would you go with? Thanks!
Now I have done lots of reading and still wondering on installing the panel if I want to/need to weld (don't have a welder but guess I can buy one and yes I can weld but has been a while) or just do the 3m panel adhesive and rivets. I read that using steel rivets about 1" apart is just as strong as welding and so is the 3m panel adhesive. What would you go with? Thanks!