cassio
NAXJA Forum User
- Location
- san antonio, TX
since i have the 27 spline shaft 8.25 i want to upgraded to a more permanant set up with the 29 spline shafts.
if i purchase a lunch box locker for the 8.25 with 29 splines and install it into my current carrier set up will i be able to run 29 spline axles.
plus will a simple removal and instaltion of the carrier require to re set up the gears??
cassio
if i purchase a lunch box locker for the 8.25 with 29 splines and install it into my current carrier set up will i be able to run 29 spline axles.
plus will a simple removal and instaltion of the carrier require to re set up the gears??
cassio