rpraterxj
NAXJA Forum User
- Location
- Lake Forest, CA
to finally getting the 99 lifted. After 2 week stall period due to work and illnesses (me and my son), I spent 11 hours on the dang thing today. I needed about 1 more! All thats left to do is double check some bolts, check the alignment, check all of the fluids, bleed the brakes, then test drive!
After a week of driving then I install the rock rails and rear bumper. I just want to get the dang thing back on the road!
I will finish up tomorrow evening!
After a week of driving then I install the rock rails and rear bumper. I just want to get the dang thing back on the road!
I will finish up tomorrow evening!