• Welcome to the new NAXJA Forum! If your password does not work, please use "Forgot your password?" link on the log-in page. Please feel free to reach out to [email protected] if we can provide any assistance.

Whatcha need to get done before WF18

Trans pan gasket
Exhaust donut gasket
Fix kick down cable end clip
Adjust steering
Gusset panhard bracket
Coolant
Exhaust hanger
Fix broken bolt for cross member to unibody

Welp got a few things done but decided to make quite a few last minute changes.

Install Ares fab 3 link (sorry IRO y link its time to retire you after I bent you at the cliffs)
Install new Arb/old man emu leafs (9 year old leafs from a previous jeep need to retire too.)
Cut crappy track bar frame side bracket off and weld new one in
Coolant
Adjust steering
Exhaust Hanger.

Last minute decisions will be the death of me. Won't have the leafs and 3 link for 2 weeks still
 
Needs done:
Finish installing rear WJ seat, c pillar tube work and dual sheer mounts for the rear 5 point harnesses.

Figure out why my new blue top steering box/ 1yr old Psc PS pump with filter and cooler is hard to turn and whines real bad.

Get new inner axles seals and Pinion bearing/seal in my front axle.

Install last of my new paracord grab handles I got to put all over the place.

Re-install the air tank for my o.b.a. so my lockers work again.

Touch up paint from welding in new c pillar tubing.

Install some cage pads on interior tubes.

Install Iron Man 4x4 track bar cross brace.

Clean and oil air filter, check/change all fluids and grease all zerks.

Re-install subwoofer :)

Fix or get rid of rock lights.

Get a couple tires for my piece of crap trailer that I keep saying I am going to sell and replace, yet bring back every year.

Done:
I got the new blue top steering box and Iron Man Fabrication steering box brace installed and a smaller pulley on Ps pump.
 
Last edited:
Weld in frame stiffeners

Install IRO 3 LINK-Crossmember installed/waiting on new axle

Install transfer case skid

Rear Bump Stops-

Tie in bumper/build new bumper-

Regear front axle to 4.10-New locked axle ready to go in

Wire up E Locker

Wire up winch-DONE

Raise exhaust-Probably wont happen

Sent from my SM-G955U1 using Tapatalk
 
Need to do list:
1) Buy and mount a full size spare(33x10.50x15):mounted and ready
2) Fill with gas: will do
3) Buy some beer:done
Like to do list:
1) New battery to support the new winch: not yet
2) Two new or rebuilt drive shafts to get rid of vibes between 50-60 MPH: Got one, will install
3) Buy some beer
Never gonna happen before WF list:
1) 456:1 gears : doing at Magyvers tomorrow
2) Buy and install remanufactured motor: maybe before the crawl
3) Buy some beer (that is prolly gonna happen)
 
surprised this didn't get started yet.

i am planning on bring my TJ. picked it up a few months ago and it needed a few thing before i can start wheeling

no power steering. investigate and repair.
no windshield wiper arms or blades. replace.
new plugs, wires, cap, rotor
new battery
seafoam motor
replace some form of exhaust
repair trans shifter
seat belts don't work. investigate and repair.
install roof.

after i get it drive able and roadworthy, start working on tech requirements.

update:

new battery-done
new battery terminals-done
new power steering reservoir-done
new power steering pump-done
new wiper blades-done
new wiper arms-done
new wiper motor-done
new air filter-done
new spark plugs-done
new distributor cap-done
new spark plus wires-done
new distributor rotor-done
new shift knob-done
repair trans shifter-done
new serpentine belt-done
new drivers seat belt buckle
repair to exhaust pipes-done
new muffler-done
new exhaust hangers
new fuse box cover
new 33' spare
install roof
new side view mirrors
repair rear view mirror
cut and trim front fenders
relocate turn signals and replace with LED
new spare tire carrier
get all gear, tools, parts, and equipment ready

getting things checked off
 
Last edited:



5a58f43e08b37181ddeeece2cd042c98.jpg


mac ‘gears’ gyvr
 
Weld in frame stiffeners-DONE

Install IRO 3 LINK-DONE

Install transfer case skid-

Rear Bump Stops-

Tie in bumper/build new bumper-

Regear front axle to 4.10-DONE

Wire up E Locker

Wire up winch-DONE

Raise exhaust-getting quotes

New Coils/front shocks-
 
The list just keeps growing:

Need to do list:
1) Buy and mount a full size spare(33x10.50x15):mounted and ready
2) Fill with gas: will do
3) Buy some beer:done
Like to do list:
1) New battery to support the new winch:-gonna have to be alright
2) Two new or rebuilt drive shafts to get rid of vibes between 50-60 MPH: new rear installed
3) Buy some beer
Never gonna happen before WF list:
1) 456:1 gears : done
2) Buy and install remanufactured motor: maybe before the crawl
3) Buy some beer (that is prolly gonna happen)

New list:
1) New u-joints for front axle shafts
2) New hub bearings-ordered
3) Bake some corn bread
4) Buy some beer-Again?

 
I guess I should check over the jeep?
 
Weld in frame stiffeners-DONE

Install IRO 3 LINK-DONE

Install transfer case skid-

Rear Bump Stops-Done

Tie in bumper/build new bumper-

Regear front axle to 4.10-DONE

Wire up E Locker-Done

Wire up winch-DONE

Raise exhaust-Done

New Coils/front shocks-Done

Sent from my SM-G955U1 using Tapatalk
 
Install SYE, Rework New Rear Shaft
Install front axles with Almost Alloys installed.
Air up leaky tire, and slime it.

Changed oil
Adjusted driveshafts
Fixed battery connection
Replaced leaf bushings
Checked all fluids
Adjusted shifter linkages
 
Win money in Vegas this week!

mac ‘that would help get things done’ gyvr
 
Welp got a few things done but decided to make quite a few last minute changes.

Install Ares fab 3 link - DONE
Install new Arb/old man emu leafs - DONE
Cut crappy track bar frame side bracket off and weld new one in - DONE
Coolant - DONE
Adjust steering - DONE
Exhaust Hanger. - DONE
Trim front fenders more - DONE

Last minute decisions will be the death of me. Won't have the leafs and 3 link for 2 weeks still

Need to
Adjust pinion angle
Tighten all jam nuts
Test drive
Front door speakers
Fix T case shifter mount
 
Back
Top