Guess I'll play..

Get spare tire
Swap over tire carrier
Finish rear shocks through the floor
Order shocks for the rear
Make some covers for where the uca and traction bar come through the floor
paint and put on D44 cover
CB radio
paint and install battery box
inspect, register, insure it
 
plan 1:
- build new frame - hack patched existing "frame"
- build new axles - nope
- freshen up spare motor (or 5.2?), trans, transfer case, install sye, install on new frame - have 5.2, have ECU, have clutch stuff, have slave cyl, have nv3500, have sye, have np231 (thanks Rich!), need to get crackin' on the frame and assemble new drivetrain :D
- build 3 link and attach axles to frame in various ways - nope
- put cab and new bed on new frame, install new floors - nope
- install 97+ interior - nope, probably not happening for now
- drive - nope

plan 2:
- wait until a week before (alright fine, the day before) - so far so good
- panic - nope
- booger weld patches across the holes and cracks in my frame - done!
- throw every jeep part I own in the back - nope
- throw every tool I own in the back - nope
- do not remove trash from rocktoberfest, fallcrawl, or any other run from the back, under any circumstances - all removed, bed is almost empty :shocked:
- throw all the beer and hard alcohol I can find in the back - nope
- throw hammock in the back - nope
- buy food on the way out of town at 2am Saturday - nope
- drive - nope

I am sure what actually happens will fall somewhere between these two plans. - yup
 
Same here :eyes:
 
my jeep
move up shock mounts on axle
new rear shocks
limit straps

wife's jeep
put lift and tires on Done
tank skid
trans skid
clean inside
fender flares
talk her into taking both jeeps.Done thought it was going to be hard I was wrong
fix rear brake hardline
Build front rear bumpers
 
-Cut out floor and build subframe and skin it, relocate stock AW4 shifter
-Finish front half doors and trimmed for rockers
-Build rear shock hoops, tie them together and to other stuff, mount shocks
-Build rear bumpstop pads and mount poly bumps
-Finish painting the jeep with a brush
-Make rocker and belly skids, 1/8" plate + 1/2" plastic
-Some sort of seatbelts, probably just gunna run stock ones for now
-PSC hydro assist setup
-Tiddy up brake plumbing and rebleed
-Muffler heatshield/gas tank housing sheetmetal
-Maybe some shorter shackles
-Play with the StaK
-Regrease/hit the instrument panel so my gauges will stay working again
-Shakedown run and some thorough testing
-Try not to flop it, I'll wait til NACfest for that
-Acquire new tow rig possibly



:thumbup:
 
Daily driver is always "done"! :laugh3:
 
make it so i feel that its safe to drive 6 hours there, wheel, and 6 hours back.

make new shackles to lower it
swap out coils to lower it
install one shock
install front shafts
redo exhaust
pull diff covers, inspect, re-seal

cage?
front airbumps?


id say i have a solid weekend of lazily working on it ahead of me. i know i might also be forgetting a few things.
 
finish power steering stuff - done. no assist for now, got a free stock box from a buddy, got my money back from tom. JUST KIDDING. box is good, need to get a working pump. muhhhh
install bumpstops - fronts done
install shocks - done
register and insure it - done
get wheels and tires - got wheels, tires this week
finish the cage/bumpers/etc
get new pass side knuckle+ball joints - done and done
route front OX cable done
tidy up rear brake lines
trim gas tank skid so the 60 pumpkin doesnt smash it
crossmember+skid
shorten front DS done, not balanced enough to do 60mph+ but whatev
install ZJ prop valve - done
 
finish power steering stuff - good enough
install bumpstops - fronts done
install shocks - done
register and insure it - done
get wheels and tires - done
finish the cage/bumpers/etc
get new pass side knuckle+ball joints - done and done
route front OX cable done
tidy up rear brake lines
trim gas tank skid so the 60 pumpkin doesnt smash it
crossmember+skid
shorten front DS done, not balanced enough to do 60mph+ but whatev
install ZJ prop valve - done

four wheel drive works, lockers work, steering works, brakes work. as of right now i am ready to wheel. :thumbup:
 
- DONE Bend up harness bar and X brace for cage, finish weld and paint it (hopefully this weekend)
- Finish building 440
- DONE (surprisingly wasn't that bad haha) Get 440 to fit in engine bay :laugh:
- DONE - Build motor mounts
- DONE - Modify/ build crossmember, transmission mount, NP205 rear mount
- DONE - Redo traction bar crossmember mount (move to passenger side)
- Build new driveshafts
- Mount radiator, plumb cooling
- DONE - Build exhaust
- T-case shifters
- Center console and transmission tunnel
- Slave cylinder mounting/routing
- New dash and gauges
- Megasquirt and TBI
- Clean up wiring harness
- Seal up/paint NP241/NP205/NV4500
 
- DONE Bend up harness bar and X brace for cage, finish weld and paint it (hopefully this weekend)
- Finish building 440
- DONE (surprisingly wasn't that bad haha) Get 440 to fit in engine bay :laugh:
- DONE - Build motor mounts
- DONE - Modify/ build crossmember, transmission mount, NP205 rear mount
- DONE - Redo traction bar crossmember mount (move to passenger side)
- Build new driveshafts
- DONE - Mount radiator
- Plumb cooling
- DONE - Build exhaust
- T-case shifters
- Center console and transmission tunnel
- Slave cylinder mounting/routing
- New dash and gauges
- Megasquirt and TBI
- Clean up wiring harness
- Seal up/paint NP241/NP205/NV4500
 
make it so i feel that its safe to drive 6 hours there, wheel, and 6 hours back.

make new shackles to lower it
swap out coils to lower it
install one shock
install front shafts
redo exhaust
pull diff covers, inspect, re-seal

cage?
front airbumps?


id say i have a solid weekend of lazily working on it ahead of me. i know i might also be forgetting a few things.

new plan:

put axles together
slap axles under j10
fuel inject it
fancy tires

and possibly chop up the bed.
 
oopDate

Put some glass in my hatch
get the bolt for my atlas shifter that fell out at rocktober
lock 60 Done
rebuild king pins and breaks
install 60 Done
build steering
Buy 2 cheap 35" rubbers for 17" rims plans changed
37x14r16.5 IROKs Done
H1's Almost

Lock 14b Done
Gear 14b In Progress
Disk Swap