PDA

View Full Version : Rubicon work project results


Simple Man
August 21st, 2006, 07:28
Last weekend there was an FOTR work party on the Rubicon.

Here is a link to some photos from the weekend:

http://www.norcalttora.com/albums/album248/aaa.sized.jpg

There was a full write-up e-mailed out if you are on the FOTR e-mail list.

Go to http://delalbright.com/Rubicon/frameset.htm if you'd like to get on the e-mail list.





.

Jes
August 21st, 2006, 17:14
Great weekend to get some work done, beutiful weather.
We(Dysfunctional Rockcrawlers) worked on the base of Walker Hill and extended the log/rock ramp about 40 feet to help withthe erosion problem. It still needs a little work and probably some dead fall on the upper side to keep the motorcycles on the trail.
Big thanks to Pirates Of the Rubicon for all the rock hauling they did and thanks to all the random people who showed up to help when some of us were running out of steam. :cheers:
http://www.fototime.com/{F6B02A12-525F-4548-892E-B0831D330AC0}/picture.JPG
http://www.fototime.com/{D4A2614A-0573-448F-B9C4-DEA7541F58E4}/picture.JPG
http://www.fototime.com/{D9AE65A8-DEF7-440B-B0D3-B4545372BB27}/picture.JPG