brandonmcnulty
July 26th, 2006, 16:23
Hello i raised the front of my jeep comanche 89 4x4 4.0 4 inches and now what connects the axle to the sway bar is bent into the coil springs. Im just going to weld some all thread on to the top of the connectors there already since im broke, (from trying to get this thing to stop leaking every type of fluid possible) my question is how long of all thread should i attach to the top? 4 inches like my lift? that sure seems like alot to me but yet i dont know much about this. Any help is appreciated thanks
Brandon McNulty
Brandon McNulty