And 2 in. is probably too long. Just install the tie-downs past the gas tank, and drill from underneath, you might need to pull the skid for access.I want to install some metal strips for tie-downs in the cargo area.
How long a screw can I use without worry. A 1" is too short.
Anyone done this and can help?
edit: 99, 4.0, pre-97 gas tank skid.
And 2 in. is probably too long. Just install the tie-downs past the gas tank, and drill from underneath, you might need to pull the skid for access.
Use large pop rivets.
Yeah, that's exactly what I'm trying to avoid. I think rivets might be the answer.Yep - drill around the tank. I was stupid, measured wrong, and drilled a hole into my tank. Was a complete PITA to patch the hole in the tank.